OPERATING INSTRUCTIONS AND MAINTENANCE MANUAL
9.6.6
PROGRAM SETTINGS screen
Settings screen allows the user to configure program parameters as well as
accessing to the registers, by 5 submenus: SERVICE, VF ABB, CALIBRATION, PIDs
and REGISTERS.
SERVICE
To configure the basic parameters for execution of equipment operations.
EMPTYING
Emptying time:
DOSIFICATION
Spillover
Max ocilation SCAN
LOAD FACTORY SETTINGS
Load settings
There should be enough drain time to ensure the reactor's double jacket is fully
drained. See Section 9.3.1 for more information on how to set this time.
Ref. ProJect / Revision:
721021-07 / R01
721021-70-1 / 721021-70-3
VESSEL FOR CREAMS – Mod. VCR 1002 / MELT TANK – Mod. MET 0400
The time it takes to drain the reactor's double jacket for
the draining operation and also before heating or cooling
the reactor.
The volume of water which remains in the tube section
from the valve to the reactor inlet.
The maximum admissible weight oscillation for
considering the weight to be stable.
It allows you to load the default values.