7 TRIM FLANGE ATTACHMENT
Position Flange (7A) on Valve (7B) with Drain Hole (7C) at the bottom. Place
Protective Washer (7D) on the short end of the reversible Retainer Sleeve (7E).
Screw Retainer Sleeve (7E) onto threaded section of the Stem and Bonnet (7G).
Tighten Retainer Sleeve (7E) by hand until Flange (7A) is snug to finished wall
surface. If the short end of the Retainer Sleeve (7E) is too short, reverse it to
use the longer end.
8
8A
8C
8D
8 HANDLE ATTACHMENT
Place Handle Hub (8A) onto the Valve Stem (8B) and secure with Set Screw (8C).
Attach Decorative Button (8D) over screw access hole and press firmly.
7B
7C
8B
ENGLISH
9
9B
9 SHOWER ARM INSTALLATION
Insert the long end of Shower Arm (9A) through the Shower Flange (9B).
Apply PTFE plumber's tape to both ends of Shower Arm (9A) according to
manufacturer's instructions. Screw long end of Shower Arm (9A) into pipe elbow
inside the wall. Slide Shower Flange (9B) tight to the wall.
10
10B
10 SPOUT INSTALLATION
Apply PTFE plumber's tape on both ends of Pipe Nipple (10A) (not included).
Screw Pipe Nipple (10A) into the elbow inside the wall and tighten with pipe
wrench. The Pipe Nipple (10A) is to project 3
Screw Tub Spout (10B) onto Pipe Nipple (10A) and tighten until Spout is properly
positioned and flush to the finished wall.
11
11 UNIT START UP
Turn on hot and cold water supplies, and check all connections for leaks.