Section 3. Installing The Deck Canister; In-Deck Installation - Jandy JLLED4C Serie Manual De Instalación Y Operación

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Section 3. Installing the Deck
Canister
NOTE: Prior to installing the Jandy Laminar Jet deck
canister, locate the jet opening (slot) in the deck
canister cover. Make sure that this opening is
pointing towards the desired target location
in the pool. Use the water stand pipe as a
reference. Determining the orientation of the
deck canister will also establish where to place
the plumbing and fiber optic conduit.
NOTE: The deck canister lid can only rotate
approximately 90 degrees to the left or the right.
Therefore, make sure that the deck canister is
positioned towards the desired target location
prior to completing the installation.
3.1

In-Deck Installation

1.
Dig the hole for the deck canister approximately
24 inches deep and 18 inches in diameter. This will
ensure enough room for positioning the canister
and laying out the plumbing. This depth also
allows for the addition of a layer of pea gravel,
about 1/8 to 1/4" size (3-6 mm), for stability
and additional drainage. Refer to deck canister
dimensions.
Water Output
Deck Canister
Lid with Slot
Deck Material
Laminar Jet
Assembly
Water Inlet to Jet
Assembly
¾" (19 mm)
Electrical Conduit
1" (25.4 mm) PVC
Stand Pipe
Figure 3.
Laminar Jet Deck Canister Schematic
Jandy
Laminar Jet | Installation and Operation Manual
®
Deck Canister Lid
Adjustable Collar
Deck Material
Deck Canister
1" (25.4 mm) Laminar
Jet Water Supply
1½" (38 mm)
Drain Line
13.75 in. (35 cm)
12 in. (30.5 cm)
21.78 in.
(55 cm)
Figure 4.
Deck Canister Dimensions
Horizontal
Rebar
Hooks
(4 Places)
Stake-Up
(25.4 mm)
Stand Pipe
Horizontal Rebar
Figure 5.
Deck Canister Rebar Hooks and Sockets
2.
Set the deck canister in the hole. The top edge of
the lid/collar should be flush with the finished deck,
after the deck material is poured.
NOTE: To ensure that the canister stays upright while
installing and leveling the unit, place a 6 inch
(15 cm) piece of 1 inch (25.4 mm) PVC pipe
in the construction support stake-up socket
located on the bottom of the canister.
3.
Level the deck canister. To hold the canister in place
while the deck is poured, secure the canister by tying
it with tie wire to the steel framework of the deck.
To mount level, horizontal rebar hooks and vertical
rebar sockets are provided around the outside of the
canister.
ENGLISH
Page 7
ENGLISH
2.50 in. (6.4 cm)
18.18 in.
(46 cm)
Vertical
Rebar
Sockets
(4 Places)
Socket
1"
PVC
Vertical Rebar