INSTALLATION PROCEDURE / STEP 12
12
Install the fixed panel. Put the fixed panel into the bottom track and the wall channel.
LEFT HAND ASSEMBLY
INSTALLATION PROCEDURE / STEP 13
Measure and cut the running rail. Measure from wall to wall at the top of the shower door opening.
13
Mark the running rail at the determined distance and cut. Smooth the rough edges where the
running rail was cut. Taking care to avoid damaging finished surfaces. Install running rail.
NOTE: Recommend bi-metal hacksaw/reciprocating/bandsaw blade to cut the stainless steel header.
LEFT HAND ASSEMBLY
Only cut this side if necessary!
RIGHT HAND ASSEMBLY
RIGHT HAND ASSEMBLY
Only cut this side if necessary!
- 9 -