INSTALLATION PROCEDURE / STEP 2
Put the door panel inside your shower and have the wood blocks set under the bottom of the panel
2
as illustrated.
LEFT HAND ASSEMBLY
INSTALLATION PROCEDURE / STEP 3
Use a professional level and the provided cardboard positioner for this step. Before installing the wall
3
channel, determine the position of both (right and left) wall brackets. Use the bottom hole only to mark
the wall bracket placement. (Approx. 73 ). You need 3 of base width to mount the bottom rail to the
shower base (see page 11). Mount as close to the outside of the shower base threshold as possible.
LEFT HAND ASSEMBLY
RIGHT HAND ASSEMBLY
RIGHT HAND ASSEMBLY
- 4 -