released into the rooms to be heated by
the nozzles connected to the holes on the
cover of the hood with aluminium pipes
Ø 14 cm.
It is essential to guarantee the return of
is installed by means of grills at the base
of the walls or gaps under the doors.
The diameter of the pipes must not be
less than Ø 14 cm.
The line of the pipes must be as straight
as possible.
The aluminium pipes can be hidden with
coffer work or false beams or they can
be built into the walls; in any case, they
must be well insulated.
length of 6÷8 m each for version V and
4÷5 m each for version N.
The said length must be decreased by
1.2 m for every curve and for every noz-
loss.
Installation of hot air circulation kit
The following kits are available to chan-
nel hot air.
holes in the shell
with the bands provided
- set the frames with the connection of
the two nozzles "B2" into the upper part
of the mantel
- connect the two aluminium pipes to
the connections, locking them with the
bands; press in the front grills.
adjacent
holes in the shell
with the bands provided
- set the frame with the connection of
nozzle "B1" into the upper part of the
mantel
- set the frame with the connection of the
be heated
- connect the two aluminium pipes to
the connections, locking them with the
bands;
press in the front mantel grills.
- set the frame with the connection of the
be heated
- connect the two aluminium pipes to
the connections, locking them with the
bands; press in the front grills.
All manuals and user guides at all-guides.com
INSTALLATION
adjacent
holes in the shell
with the bands provided
- set the frames with the two nozzles
heated
the mantel to allow for aeration inside
the mantel
- connect the two aluminium pipes to
the connections, locking them with the
bands; press in the front grills.
Kit four/bis
(ONLY for SIDE 2)
holes in the shell
with the bands provided
- set the frame with the connection of
nozzle "B1" into the upper wall of the
mantel
- set the frames with the three nozzles
heated
- connect the four aluminium pipes to
the connections, locking them with the
bands; press in the front grills
(ONLY for SIDE 2)
holes in the shell
with the bands provided
- set the frames with the four nozzles
heated
for aeration inside the mantel
- connect the four aluminium pipes to
the connections, locking them with the
bands; press in the front grills
The hot air output vents, at the top of
the hood, that are not used must be left
closed with the special caps provided.
Special channelling can be created by
available, as shown in the price list.
- 22
-