Operational Principle; Installation Diagram; Electrical Shock Hazard - Pool Technologie ORP Instrucciones De Uso

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 18

1. OPERATIONAL PRINCIPLE

ORP measurement lower than the ORP setpoint
ORP measurement higher than the ORP setpoint
Forced operation activated

2. INSTALLATION DIAGRAM

Before switching on the power, make sure that all of the electrical wiring is undertaken.
Condition
H
6
H
13
1 : Electronics unit
2 : Pool Terre (optional)
3 : Probe holder
4 : ORP probe
5 : Bracket
for a fixed period and without interruption

ELECTRICAL SHOCK HAZARD

10
12
ELEMENTS NOT SUPPLIED :
6 : Electrical power supply
7 : Copper cable
8 : Chlorinator cell
9 : Electrolyser
10 : Filter
11 : Ground rod
12 : Heat pump
13 : Filtration pump
Immediate automatic action
Switching on the electrolyser
Switching off the electrolyser
Switching on the electrolyser,
1
4
3
5
4
2
7
11
9
8
3

Publicidad

Tabla de contenido
loading

Productos relacionados para Pool Technologie ORP

Tabla de contenido