1. OPERATIONAL PRINCIPLE
ORP measurement lower than the ORP setpoint
ORP measurement higher than the ORP setpoint
Forced operation activated
2. INSTALLATION DIAGRAM
Before switching on the power, make sure that all of the electrical wiring is undertaken.
Condition
H
6
H
13
1 : Electronics unit
2 : Pool Terre (optional)
3 : Probe holder
4 : ORP probe
5 : Bracket
for a fixed period and without interruption
ELECTRICAL SHOCK HAZARD
10
12
ELEMENTS NOT SUPPLIED :
6 : Electrical power supply
7 : Copper cable
8 : Chlorinator cell
9 : Electrolyser
10 : Filter
11 : Ground rod
12 : Heat pump
13 : Filtration pump
Immediate automatic action
Switching on the electrolyser
Switching off the electrolyser
Switching on the electrolyser,
1
4
3
5
4
2
7
11
9
8
3