User Interface Area; Installation; Regulator Overall Dimensions - Cristec YPO45-12-60/MPPT Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

2.3
U
SER INTERFACE AREA
Programming
Input
fuses
3

INSTALLATION

This paragraph deals with installation of the equipment.
Installation and initial commissioning should be carried out by an electrician or professional installer in accordance
with the standards currently in force (for pleasure boats the applicable international standard is ISO13297).
The installer should familiarize himself with this operating manual and inform users of the instructions for use and the
safety warnings set out in the manual.
3.1
R
EGULATOR OVERALL DIMENSIONS
Place the regulator vertically, connection downwards. Failure to respect this position may cause a decrease in available
power and a loss of IP level.
A clear area of 150mm is recommended all around the regulator for proper ventilation and opening of the regulator.
Never put anything on the regulator.
buttons
Can BUS
Remote
display
On/Off
Temperature
probe
Output
fuses
30

Publicidad

Tabla de contenido
loading

Productos relacionados para Cristec YPO45-12-60/MPPT

Este manual también es adecuado para:

Ypo45-24-30/mpptYpo80-12-40/mpptYpo80-24-25/mppt

Tabla de contenido