Laying Out One-Shot 90° Bends; Minimum Distance From End Of Conduit - Greenlee 881 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Laying Out One-Shot 90° Bends
1. Measure the length of the required stub.
2. Find the Minimum Stub Length on Table 2: Deduct,
Stub Dimensions, and Minimum Distance from End
of Conduit. The stub you require must be equal to or
longer than the minimum stub length.
3. Measure and mark the stub length on the conduit.
This is Mark 1.
4. Find the Deduct on Table 2. Subtract the Deduct
from Mark 1 and make a new mark. This is Mark 2,
or the bending mark. Find the Minimum Distance
from End of Conduit in Table 2; be sure that Mark 2
is at least this distance from the end of the conduit.
5. Align Mark 2 with the outside edge of the saddle.
Bend the conduit—see the instructions under
"Assembly and Operation Instructions."
Table 2 —Deduct, Stub Dimensions,
and Minimum Distance from End of Conduit
CONDUIT SIZE
EMT
Deduct
Minimum Stub Length

Minimum Distance from End of Conduit

IMC–RIGID
Deduct
Minimum Stub Length
Minimum Distance from End of Conduit
Greenlee Tools, Inc.
881 and 881CT Hydraulic Benders
2-1/2
21-1/2
24
2-1/2
21-1/2
24
2-1/2
22
STUB LENGTH
TO BOTTOM
OF CONDUIT
MARK 1
3
3-1/2
24
27-3/4
27
31-1/4
3
3-1/2
24-1/4
28-1/4
26-3/4
30-3/4
2-1/2
2-1/2
4455 Boeing Dr. • Rockford, IL 61109-2988 USA • 815-397-7070
STUB
LENGTH
DEDUCT
MARK 2
MARK
2
4
32-1/4
36-1/4
4
32-1/2
35
2-1/2

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

881ct1813

Tabla de contenido