Entretien De L'équipement; Gerätewartung; Equipment Maintenance - Ender 3D 7 Serie Manual De Usuario

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

16.Equipment Maintenance

Maintenance of sliding rails/ sliding blocks:
Three sliding rails and sliding blocks in the X/Y line should be periodically maintained (generally per 3-6 months).
When surfaces of sliding rails lack the lubricant or there is abnormal sound during the operation,
it means that balls in sliding blocks lack the lubricant and lubricating grease or lubricating fluid should be applied on the sliding rails.
56

Publicidad

Tabla de contenido
loading

Productos relacionados para Ender 3D 7 Serie

Tabla de contenido