• in case of overhead positioning, the individual support points must be realized in order to support the corresponding mass
of the section in consideration of the unit's height and in compliance with the safety limits for seismic risk. (Fig. F (concrete)
Fig. F
(structure in metal profiles));
1
• the surface of the support points must have a suitable width to allow positioning / approaching and assembly operations of
the individual sections during the installation phase (Fig. G);
• the contact surface with the base frame must be sufficiently hard and smooth to allow positioning / approaching and
assembly operations in relation to the mass of the unit;
• the overall planarity of all the individual support points must be checked and if necessary corrected using metal shims.
READ AND UNDERSTAND THE INSTRUCTIONS
Before undertaking any task the operator must be fully trained in the operation of the machines to be used and
their controls. They must also have read and be fully conversant with all operating instructions.
All maintenance must be performed by
regulations.
The installation and maintenance of the unit must comply with the local regulations in force at the time of the
installation.
F
L min ≥ 300 mm
personnel and be in accordance with all national and local
TRAINED
EN
G
30
F
1