Before Starting The Equipment; Assembly; Operation - Dexter 800ETC1 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 19

5. BEFORE STARTING THE EQUIPMENT

to the provided base frame, or similar. Before setting up the machine, choose a stable surface, that is
free of obstacles (except materials to be cut) and adequately lit.
• The cutting wheel must rotate smoothly.
• Check that the voltage on the rating plate is the same as your supply voltage before you connect the
equipment to the power supply.
• Always stand on the front of the machine (close to the transport handle) when operating.

6. ASSEMBLY

WARNING ! Pull out the power plug before assembling, adjusting
and changing the cutting wheel.
UNFOLDING THE BASE FRAME
• To set up the equipment on its feet, press the latching button and lower the feet until they latch in the
intended position. To fold up the feet, proceed in reverse order.
FITTING THE COOLING WATER PUMP
• Place the cooling water pump - with the suction cups pointing down - into the container.
• Then fasten the hose to the intended positions.
IMPORTANT ! To guarantee proper operation, the cooling water
hose must not be kinked during installation. Frequently inspect
hoses and other critical parts which could be deteriorated by
water and the pressure of the water supply.
CAUTION ! Ensure that the cable and the cooling water hose
cannot get into the cutting area.
FITTING THE TRANSPORT AIDS
• Fit the transport wheels, the parking foot and the transport handle.
FITTING THE STOP RAIL AND THE ANGLE STOP
• First push the stop rail onto the guides as shown and fasten. CAUTION! Do not position the stop rail in
line with the cutting wheel line or else it could be cut during operation.
• You can then push the angle stop into the guide and fasten in any position.

7. OPERATION

ON/OFF SWITCH
WARNING! Before starting:
• Ensure that there are no visible defects.
• Ensure that there is nothing in the work area that may hamper the work to be performed.
• Ensure that there is sufficient cooling water.
ust be securely screwed to a work bench,
the equipment is switched on.
122
FR
ES
PT
IT
EL
PL
UA
RO
EN

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

20035.1

Tabla de contenido