Greenlee 93-97/00220 Manual De Instrucciones página 12

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Continuity Check
Do not connect the meter to a source of voltage or current when the
selector switch is in the
result.
1. Shut off and lock out the power. Make sure all capacitors are fully
discharged. Voltage must not be present.
2. Plug the black test lead in to the COM terminal. Plug the red test lead into
the VΩ
terminal.
3. Set the selector switch to
4. Press
. The
5. Connect the test leads to the circuit. The buzzer will sound if the
resistance of the circuit is less than 50Ω.
12
All manuals and user guides at all-guides.com
position. Damage to the meter can
.
and Ω icons will appear.

Publicidad

Tabla de contenido
loading

Tabla de contenido