4. Fill the hydraulic oil up to the mark on the dipstick.
Note
The corresponding
operating instructions.
2.9.2.3
Making the pneumatic connection
Warning
When routing the air hoses, make sure that the air hoses are not near moving parts. It may
be necessary to secure the hoses with cable ties. Failure to do so may result in safety
deficiencies that could cause damage or injury. The air circuit must be equipped with a filter/
regulator and the air pressure must be set to 6-8 bar.
The compressed air supply is equipped with a maintenance unit consisting of a water separator, lubricator and
pressure reducer.
To connect the pneumatic lines, proceed as follows:
1. Mount the air solenoid valve on the power side column with 2x M4x30 screws.
2. Connect the pneumatic lines pre-mounted on the tracks.
3. Connect the pneumatic system of the elevator to the pneumatic supply on site.
Note
The corresponding
operating instructions.
® Copyright ATH-Heinl GmbH & Co. KG / All rights reserved / Misprints and technical changes reserved
98
"Hydraulic circuit diagram"
"Pneumatic circuit diagram"
Release date: 16.03.2023 / Product manufacturer ATH-Heinl GmbH & Co. KG
can be found in the appendix to these
can be found in the appendix to these