Descargar Imprimir esta página

battioni Pagani GARDA EVO Serie Manual De Instrucciones De Uso Y Mantenimiento página 140

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

instruction manual
for use and maintenance of the combined groups for the GARDA EVO series
INSTALLATION
The Garda Evo group must be installed rigidly on a planar frame (sized to prevent vibrations and buckling) with a
MAX tilt of 3°. Ensure sufficient space for the circulation of cooling air and to reach the lubrication points (oil levels,
grease nipples, etc.). Leave room to manoeuvre the selection levers.
oil top-up
GEARBOX LUBRICATION
The toothed wheels in the gearbox are lubricated from splashes. Ensure filling with the correct quantity of oil as
specified above.
• First oil change between 100/200 hours and then every 300 hours (see above)
• Check oil level before using the combined group
• Maximum temperature of the oil of 95°C during operation
START/USE/STOP
1. Connect the cardan shaft to the tractor PTO and to the splined shaft 1" 3/4 of the GARDA EVO group.
2. 4. Select the desired output lever and start slowly until reaching the desired RPM
3. Output selection (A or B or A + B) must be made with the PTO stopped.
4. To finish the operations disconnect the PTO of the tractor.
page 122
Figure 5 Oil top-up/inspection (sheet parameters above)
oil level

Publicidad

loading