Electrical connection
Attention
Here, the general as well as the local regulations must be observed.
Therefore, this step should only be carried out by a trained specialist. Pay attention to the
necessary supply line (see
Check before the first lifting
Check all screws, nuts, etc. for tightness
Check all connections and cylinders for tightness and tighten if necessary
Check the function of all keys. Make sure that all detents are unlocked when the lowering button is pressed.
Observe the direction of rotation of the motor
Lower the lifting platform completely and continue to press the Lower button for approx. 15 seconds so that
the hydraulic system is completely vented
After setting up, fill out the attached inspection booklet
Note
This information will be required in case of service.
3.3
Before commissioning
Warning
Before commissioning, check all fastening screws, electrical, pneumatic and hydraulic lines
and tighten them if necessary.
Caution: Some of these must be checked at regular intervals and tightened if necessary.
® Copyright ATH-Heinl GmbH & Co. KG / All rights reserved / Misprints and technical changes reserved
"Electrical
Release date: 02.05.2023 / Product manufacturer ATH-Heinl GmbH & Co. KG
connection".).