Descargar Imprimir esta página

Madas M90W Manual De Instrucciones página 9

Ocultar thumbs Ver también para M90W:

Publicidad

Idiomas disponibles

Idiomas disponibles

2.0 - TECHNICAL DATA
• Ambient temperature (TS)
• Supply voltage
• Supply voltage tolerance
• Electric wiring
• Absorbed power
• Protection rating
• In compliance with
* Only single-phase, the device does not work if it is powered with three-phase voltage.
3.0 - FIRST START-UP
3.1 - OPERATIONS PRIOR TO INSTALLATION
• Before start-up, make sure that all the instructions on the rating plate are observed;
• Cut off power prior to proceeding with wiring;
• Provide a protection against impacts or accidental contacts if the device is accessible to unqualified personnel.
3.2 - WALL INSTALLATION
It must be installed securely, fastened to an element integral with the ground (wall, masonry fences) at a height not exceeding
1m from the ground (= ground level).
• Fasten (screws not supplied) the device to the building structure using the fixing holes on the bracket (7) provided;
• It must only be installed in a vertical position (see installation example in 3.3) with cable glands facing downwards (see
figure below);
Max 5°
• Perform the connection with the solenoid valve on the system.
Madas Technical Manual - 9|9.3 - REV. 1 of 6
: -20 ÷ +60°C
: 12 Vdc - 12 V/50 Hz - 24 Vdc - 24 V/50 Hz - 110 V/50 Hz - 230 V/50-60 Hz*
: -15% ... +10%
: cable gland PG 11
: 3 VA
: IP65
: EMC Directive 2014/30/EU - LVD Directive 2014/35/EU - RoHS II Directive 2011/65/EU
9
Apr 2023
th
M90W

Publicidad

loading