Descargar Imprimir esta página

Torin BIG RED T815016L Manual Del Propietário página 7

Ocultar thumbs Ver también para T815016L:

Publicidad

Idiomas disponibles

Idiomas disponibles

SYSTEM AIR PURGE PROCEDURE
IMPORTANT: BEFORE FIRST USE
Perform the following System Air Purge Procedure to remove any air that may have been introduced into
the hydraulic system as a result of product shipment and handling. This step is to be completed without any
weight on the jack.
1. Turn release valve counter-clockwise on full turn
to the open position.
2. Rapidly pump the handle 6-8 times. Leave handle
in down position to expose oil fill plug.
3. With a flat blade screwdriver, unscrew the oil fill
plug slightly to purge trapped air from system. (For
RUBBER OIL PLUGS Use caution not to tear or
puncture the oil plug.)
4. Turn release valve clockwise to the closed
position.
5. Jack is now ready for use. Check for proper pump
action. (Repeat steps if neccessary).
7

Publicidad

loading