Descargar Imprimir esta página

Qlima R 4224S TC-2 Instrucciones De Uso página 87

Ocultar thumbs Ver también para R 4224S TC-2:

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 52
16
15
17
18
19
20
21
22
23
24
25
tighthen them.
15. Raise the wick to its highest position and tighten the
wing nuts in several steps.
16. Check the wick height. It should be 5/16 above the collar.
17. Check for the correct clearance between wick holder
and draft tube. It should be the same all around.
18a. Reinstall the tip-over switch assembly by pushing the
extinguish knob .
18b. Remove the connector (1EA) from the ignitor.
19. Check the function of the tip-over safety stop by push-
ing the extinguish button  to upset the pendulum.
20. Reinstall the automatic ignition assembly.
21. Reinstall the wind cover A / B.
22. Reinstall the cabinet N.
23. Tighten the 5 screws on the cabinet and reinstall the
sensor at the back of the cabinet N.
24. Reinstall the combustion chamber 4 and the fuel tank
.
25. Reinstall the wick adjusting knob 2 and ignition
button 3. Close the front plate.
Install the batteries in the battery case and fill the fuel
tank with Qlima Premium Quality Fuels. Set the tank
into the heater and wait at least 180 minutes for the
new wick to fully saturate with the fuel.
4
87

Publicidad

loading

Este manual también es adecuado para:

R 7227s tc-2