Descargar Imprimir esta página

HeatStar 45GSP Instrucciones De Funcionamiento Y Manual Del Propietario página 16

Publicidad

Idiomas disponibles

Idiomas disponibles

BLACK
L1
T1
Line
Load
WHITE
N
GREEN
Earth Ground
Chassis Wiring Is 18 AWG / 105 Degrees C / @ 600 Volts
Igniter Wire Is 16 AWG / 25 KVDC / 10 KVDC
Crimp Caps Are # CE5 / 105 Degrees C
BLACK
L1
T1
Line
Load
WHITE
N
GREEN
Earth Ground
Chassis Wiring Is 18 AWG / 105 Degrees C / @ 600 Volts
Igniter Wire Is 16 AWG / 25 KVDC / 10 KVDC
Crimp Caps Are # CE5 / 105 Degrees C
Install Gas Supply Lines
A ½" (1.27 cm) gas supply connection is required as shown
below. To check system pressure, a plugged 1/8" NPT
tapping is required upstream of the manual gas shut-off
valve supplied with the heater.
Before connecting the heater to the supply system, verify
that all high pressure testing of the gas piping has been
completed.
DO NOT HIGH PRESSURE TEST THE GAS PIPING WITH THE
BURNER CONNECTED.
Follow these instructions to ensure a safe gas supply
system installation:
1. Support all gas piping with suitable pipe hanging
materials.
2. Use wrought iron or wrought steel pipe and malleable
iron fittings. The use of copper tube and brass fittings
is acceptable when such use is in compliance with local
codes. All pipe, tube, and fittings should be new and free
from defects. Carefully ream the pipe and tube ends to
remove obstructions and burrs.
3. Use LP-resistant joint compound on all threads.
4. Check the pipe and tube connections for leaks before
placing heating equipment into service. When checking
for gas leaks, use a soap and water solution; never use
an open flame.
5. The connector must be certified for use on a radiant
heater per "Standard for Connectors for Gas Appliances,
ANSI Z21.24 /CSA 6.10"
Thermostat
Pressure Switch
WHITE
PURPLE
PURPLE
WHITE
RED
BLACK
BLACK
C1
M
Blower Motor Cavity
WHITE
Thermostat
Pressure Switch
GREEN
WHITE
PURPLE
PURPLE
WHITE
Replace Any Wiring With Same Ratings
All Quick Connects Are Fully Insulated (Except Igniter)
RED
BLACK
BLACK
C1
M
Above: Connection Diagram
Blower Motor Cavity
WHITE
Right: Ladder Diagram
GREEN
Replace Any Wiring With Same Ratings
All Quick Connects Are Fully Insulated (Except Igniter)
Gas Service Installation
Gas-Fired Low-Intensity Infrared Heater
WIRING DIAGRAM
Igniter & Flame Sense
IGN
GND
V2
24 VAC
L1
IND
NC
YELLOW
V1
PSW
TH
CONTROL BOARD
GV
Igniter & Flame Sense
FC-
IGN
FC+
GND
LED
V2
24 VAC
L1
IND
NC
YELLOW
V1
PSW
TH
CONTROL BOARD
GV
NOTE: A plugged 1/8" NPT tapping must be provided
upstream of the gas supply to the heater. The gas
supply line connecting to the heater appliance
should be such that it allows for some movement
of the unit. The appliance will go through
expansion and contraction during a heating cycle.
3" (7.62 cm) MAX
DISPLACEMENT
HEATER MOVEMENT
HEATER MOVEMENT
16
Operating Instructions and Owner's Manual
L1
FC-
FC+
LED
L1
L1
T'STAT (Optional)
PCB
PCB
JUMPER (Optional)
IGN
PCB
T1
PRIMARY - 120V
SECONDARY - 24V
24 VAC
PCB
TH
PCB
PRESSURE SWITCH
T'STAT (Optional)
V1
PCB
JUMPER (Optional)
CORRECT POSITIONS
VERTICAL
(AS SHOWN AT LEFT)
12"
(30 cm)
END VIEW
HEATER MOVEMENT
INCORRECT POSITIONS
HEATER MOVEMENT
WRONG
WRONG
HEATER MOVEMENT
WRONG
WRONG
L1
PCB
IND
PCB
IGNITER/FLAME SENSOR
IGN
PCB
T1
PRIMARY - 120V
SECONDARY - 24V
24 VAC
PCB
TH
PSW
PCB
N
PRESSURE SWITCH
V1
GV
PCB
IND
M
IGNITER/FLAME SENSOR
BURNER
PSW
PCB
V2
GND
GV
PCB
Earth &
Chassis Ground
ALTERNATE
POSITIONS
OKAY
M
BURNER
PCB
V2
G
PCB
C

Publicidad

loading