Descargar Imprimir esta página

CP PT031-T9000-I10S Manual De Instrucciones página 46

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 12
Part no
2050505693
Issue no
1
Series no
C
Date
2006-12
Page
46/49
To refill the pulse unit
Keep the pulse unit at normal room temperature.
A
Before the refill: Let the bubbles in the oil fade away, at least 30 min. after last run.
Check that there are no bubbles in the oil and that the pulse unit is completely full (100%)
before reducing the oil volume according to operation No. 10.
Correct oil quantity: Fill to 100%, then reduce according to table. After
the refill - check the tightening torque, and pulse frequency according
to test methods.
Oil volume to be re-
Approx. oil volume
duced from 100%
in pulse-unit
0.2 ml
5.5ml
Oil : 22 cSt / 40 o C (ISO VG22)
OFF
2.5 mm
6
7
No.: 451 213
5 ml
8
9
Fill to 100 %
1 ml
Reduce
10
according to table
No.: 459 663
1 ml
2 Nm
2.5 mm
11

Publicidad

loading