Descargar Imprimir esta página

Craftsman CMXEOCG571 Manual Del Usuario página 14

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALLATION STEP 2
INSTALL THE HEADER BRACKET
You can attach the header bracket either to the wall above the garage door, or to
the ceiling. Follow the instructions which will work best for your particular
requirements. Do not install the header bracket over drywall. If installing into
masonry, use concrete anchors (not provided).
WALL HEADER BRACKET INSTALLATION
1. Center the bracket on the vertical centerline with the bottom edge of the
bracket on the horizontal line as shown (with the arrow pointing toward
the ceiling).
2. Mark the vertical set of bracket holes. Drill 3/16" pilot holes and fasten
the bracket securely to a structural support with the hardware provided.
CEILING HEADER BRACKET INSTALLATION
1. Extend the vertical centerline onto the ceiling as shown.
2. Center the bracket on the vertical mark, no more than 6" (15 cm) from the
wall. Make sure the arrow is pointing away from the wall. The bracket
can be mounted flush against the ceiling when clearance is minimal.
3. Mark the side holes. Drill 3/16" pilot holes and fasten bracket securely to
a structural support with the hardware provided.
HARDWARE SHOWN ACTUAL SIZE
Lag Screw
5/16"-9x1-5/8"
Figure 1
UP
Optional
Mounting Holes
Header Wall
Header
2x4
Bracket
Structural
Support
Horizontal
Line
Highest Point of
Garage Door Travel
Figure 2
Header
Bracket
6" (15 cm) Maximum
Door
Spring
Garage Door
14
Wall Mount
Vertical
Centerline
of Garage Door
Door Spring
Garage Door
Vertical
Centerline
of Garage Door
Ceiling Mounting Holes
UP
Finished Ceiling
Vertical Centerline
of Garage Door
Lag Screws
5/16"-9x1-5/8"
Header Wall
Vertical
Centerline
of Garage Door
Lag Screws
5/16"-9x1-5/8"

Publicidad

loading