Descargar Imprimir esta página

MSW Proliftor PROFRAME 600 Manual De Instrucciones página 6

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 17
EN
5)
Choose the applicable electric hoist, make sure the canatlever is tight when installa-
tion and will not have any slippage.
6)
After installation, please do the up and down no-load testing and 45° left and right
rotation testing at least 2 times, then add the load capacity to rated slowly.
7)
After testing, please tight the bolt and adjust the torque.
H
WARNING
-
Periodically check the supporting steel pipe to make sure that it doesn't rock nor
bend and often check the every structural part of rack to make sure there is no
damaging and cracking.
-
Don't overload
-
Don't load person
-
Don't stand under the hoist
10
All manuals and user guides at all-guidesbox.com
-
-
MAINTENANCE
After using, often check every part of rack to make sure there is no damaging,
fastening, bolt is no looseness, especially the clamping bolt.
It must be proper packaging after disassembling when transportation, and don't omit
any parts.
PROFRAME SERIES 600 AND 1000
*
* only for PROFRAME 250
Pic. 1
Rev. 10.02.2022
Rev. 10.02.2022
It is forbidden to operate by a person who doesn't know the safety knowledge of
the product, the installation and operating must need a qualified person.
It is strictly forbidden to use two electric hoists to sling or support a weight
simultaneously.
EN
H
Pic. 2
11

Publicidad

loading

Este manual también es adecuado para:

Proliftor proframe 1000Proliftor msw-proframe-250