Operation - BOJ W-1285X Manual De Uso

Ocultar thumbs Ver también para W-1285X:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 24

Operation

Start operation
1. Cleaning the compartment
Before power on, clean inside of the appliance and check the drainage pipe in good
connection. (For details, please refer to the "Maintenance and cleaning")
2. Put the appliance still
Before power on, level the appliance on the firm & dry floor for at least 30 minutes.
3. Power on
The appliance start operation and it will cool down inside after 1 hour, otherwise you
should check the power connection.
Control panel
Single Zone model: W-0455X, W-0455B
Dual Zones models: W-1285X, W-1285B, W-0595X, W-0595B, W-0820X, W-0820B,
All keys would be invalid in lock mode. Please unlock first.
ON/OFF
1. Keep pressing the key 3 seconds, power down, goes to stand-by mode.
2. Keep pressing the key again 3 seconds to return back to normal working.
screw the flange screws; Put on the door hinge
cover; Put the cap to the up right side.
W-0821X,W-0821B
- 17 -
English

Publicidad

Tabla de contenido
loading

Productos relacionados para BOJ W-1285X

Tabla de contenido