Descargar Imprimir esta página

Grandstream GWN7662 Guía De Instalación Rápida página 4

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 7
Wall Mount
1. Connect the Ethernet cable (RJ45) to the correct ports of your
GWN7662.
2. Align the arrow on the GWN7662 AP with the arrow on the lock-
ing tab of the mounting bracket and ensure that your GWN is firmly
seated on the mounting bracket.
3. Turn the GWN clockwise until it locks into place and fits the locking
tab.
1
2
4. Connect the power cable and the ethernet cable (RJ45) to the cor-
rect ports of your GWN7662.
5. Align the arrow on the GWN7662 AP with the arrow on the locking tab
of the mounting bracket and ensure that your GWN is firmly seated
on the mounting bracket.
6. Turn the GWN clockwise until it locks into place and fits the locking
tab.
4
Wall
Wall
PA3.5 x 20
PA3.5x20
Screw
Screw
Plastic Expan-
Plastic Expansion
sion Bolt
Bolt
5
~3~
Ceiling Mount
Note: Ceiling mounting is recommended for optimal coverage perfor-
mance.
1. Remove the ceiling tile.
2. Place the ceiling backing plate in the center of the ceiling tile and
mark the mounting screw holes (screw holes DIA 5.5mm, reticle
hole DIA 25mm).
3. Insert the screws through the mounting
1
3
4. Connect the Ethernet cable (RJ45) to the correct ports of your
GWN7662.
5. Align the arrow on the GWN7662AP with the arrow on the locking
tab of the mounting bracket and ensure that your GWN is firmly
seated on the mounting bracket and connect the network and power
cables.
6. Turn the GWN clockwise until it locks into place and fits the locking
tab.
4
6
bracket.
Ceiling
M3 nut
Mounting
2
M3.0x50 screw
5
~4~
3
6

Publicidad

loading