5
HANDLE INSTALLATION
• Push the two HANDLE ADAPTERS (1) on to
VALVE STEMS (4) and secure with SPACERS (2)
and HANDLE SCREWS (3).
• Push the two HANDLES (5) over HANDLE
ADAPTERS (1).
• Secure the two HANDLES (5) with SET SCREWS
(6) and the provided HEX WRENCH (7).
A
6
SERVICE
Turn off hot and cold water
supplies before beginning.
ADJUST HOT LIMIT STOP:
•
By restricting HANDLE rotation and limiting the
amount of hot water allowed to mix with the cold,
the HOT LIMIT SAFETY STOP (1) reduces risk of
accidental scalding. To set the maximum hot water
temperature of your faucet valve, adjust the setting
on the HOT LIMIT SAFETY STOP (1).
• Turn CARTRIDGE STEM (2) to the OFF position
(coldest setting) before making adjustment to HOT
LIMIT STOP (1). Pull forward and rotate
counterclockwise one number to limit hot water
temperature. Use NUMBERS (5) on CARTRIDGE
(4) on HOT LIMIT STOP (1) for indication.
4
1
COLDER
(Larger Numbers)
1 2 3 4 5 6 7 8 9 10
Standard
4
1
2
3
5
6
7
5
2
HOTTER
(Smaller Numbers)
1 2 3 4 5 6 7 8 9 10
3
Back to Back