Descargar Imprimir esta página

Vortice CA 125 MD Manual De Instrucciones página 9

Ocultar thumbs Ver también para CA 125 MD:

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 14
ENGLISH
Typical applications
See Figures 1-5;
The images shown refer to typical applications for this
product.
In particular, in Figure 5, it is possible to check the
correct orientation of the product from duct:
A = intake
B = delivery
IMPORTANT
The product delivery point must always be connected
to a duct for correct operation.
Installation
See Figures 6-12.
The images shown are purely indicative.
purpose is to illustrate the main assembly steps for
the entire range.
IMPORTANT: See the "Wiring Diagrams" paragraph
to check the 3 ventilation speeds.
IMPORTANT
If the unit does not have piping connected to the
suction point (free suction) and it is installed at a
height lower than 2.3 m, assembly of the protection
grille - suction side (fig.1) is required.
IMPORTANT
Use of the supplied brackets is optional.
Wiring diagrams
See Figure 13A.
Connection with the optional device upon request is
foreseen to check ventilation speeds (device not
supplied in packaging):
- 13A) Vortice 3-speed selector Code 12.869.
IMPORTANT
Vortice guarantees correct product operation and
control only when paired with the Vortice 3-speed
selector (Code 12.869).
Other types of connection
Alternatively,
other
available, associated to different control modes
(devices provided by the installer).
Connection alternative for new installation
- 13B) Pairing with 3-switch control;
- 13C) Pairing with Electronic dimmer.
Machine replacement on existing system
Connection without modifications to the electrical
system: the same switches as on the existing system
will be used. CAUTION: it will not be possible to
connect all 3 available speeds but only those for
connection
diagrams
which the electrical system is set up (to be chosen by
the installer):
- 13D) Speed connection: Minimum and Maximum;
- 13E) Speed connection: Medium and Maximum.
CAUTION
Correct operation of ERP 2018 is only guaranteed
when set in compliance with the connection diagram
13A).
Maintenance / Cleaning
Fig 14-17.
Their
are
9

Publicidad

loading