Descargar Imprimir esta página

BGS technic 8545 Manual De Instrucciones página 11

Ocultar thumbs Ver también para 8545:

Publicidad

Idiomas disponibles

Idiomas disponibles

CHARGING THE SYSTEM
Fig.5- Open completely the valve B by turning it counter clockwise.
Fig.6- Close the suction (ball) valve C.
Fig.7- Hand tighten (close) the air valve D by turning it clockwise.
Fig.8- Close the valve E by turning it 90 degrees.
Fig.9- Connect shop air (0.1- 0.2MPa) to male adaptor A.
Air will flow through the muffler until the gauge approaches the red field (after about 2.5-3min.).
Disconnect the shop air.
The unit is now depressurized and ready for use.
SW-Stahl und Werkzeugvertriebs GmbH
L
e
v
e
k r
u
s
r e
t S
a r
s
s
e
6
5
D
4 -
2
8
9
7
R
e
m
s
c
h
e
d i
Tel. +49 (0) 2191 / 46438-0
F
ax +49 (0) 2191 / 46438-40
- E
M
a
: l i
n i
o f
@
s
w
s
a t
l h
d .
e

Publicidad

loading