INSTALLATION
Connection of safety transmitter-receiver photocells in closing (SG.C, FT1)
Connection of safety transmitter-receiver photocells in opening (SG.A, FT2)
Connection to the grid
T
58
Installation Manual
1 Complete the connections as shown in the figure.
2 Duly programme the operator:
FT1
1 Complete the connections as shown in the figure.
2 Duly programme the operator:
FT2
1 Connect the line cable (L) to the connection strip
2 Connect the earth cable (T) to the operator frame.
3 Ensure the main fuse (F) is correctly in place.
P153H
We recommend installing opening and closing
safety photocells.
Closing photocells with pre-testing: C511
Closing photocells without pre-testing: C510
Without closing photocells: C500
For further details on programming, see "Start up
and programming" on page 59.
We recommend installing opening and closing
safety photocells.
Opening photocells with pre-testing: C411
Opening photocells without pre-testing: C410
Without opening photocells: C400
For further details on programming, see "Start up
and programming" on page 59.
lower cable connector and the neutral cable (N) to
the upper cable connector.
DOS424E (230Vac/50Hz): FUS 5x20, 2.5A
DOS424EM (125Vac/60Hz): FUS 5x20, 4A
Never forget to connect the earth cable, in
order to prevent the risk of electrical discharge.