Installation
Appliance
Installation:
1. Hang hood on 2 mounting hooksthroughthe
rectangularcutouts
on back of
hood.
2. Level the appliance, using a carpenters level across bottom of hood with
leveling screws in rectangular cutouts
3. Secure hood with 2 screws on bottom and 2 on top.
Leveling Screw
Rectangular
Cutouts
Leveling Screw
Hooks
top
Fixing Screws
Figure 3
Bottom
Fixing
Screws
Figure 4
4. Connect ducting (Figure 4):
Note: for blower serviceability,
leave a gap of 1" minimum between top of
transition and sheet metal duct and cover gap with a starting collar wrapped
areu nd duct and transition. Locate collar screws so they fit into comer of duct
cover Secu re cellarte transition and duct with three sheet metal screws each
Seal with duct tape.
Be sure to locate screws below damper lines drawn on transition
Mark onto exterior of transition the ,V' location of the damper within.
Secure ducting to transition with three sheet metal screws each.
Be sure to locate screws below damper lines drawn on transition
Seal with duct tape.
Note: Do not use duct smaller than the transition.
Rear discharge: A 90 ° elbow may be installed immediately above the hood. For
serviceability,a
mounting similar to the straight up discharge should be used
6