Service Manual- SC370
04 Control system 17
Control Panel Removal and Installation
Dashboard (EB1)
Removal
1. Push the machine to a level floor.
2. Ensure that the machine is off.
3. Ensure the recovery tank is empty.
4. Remove the recovery tank assembly (Figure 5).
5. Disconnect the battery connector connected to the machine (Figure 6).
6. Use cross screwdriver to remove 16 screws on the rear cover of the handlebar (Figure 7).
7. Remove the cover of the handlebar (Figure 8).
Disconnect the battery connector
Figure 5
Figure 6
Remove 16 screws
Remove the cover
Figure 8
Figure 7