NOTE
Save carton and these Installation Instructions for future reference. The carton is the
best way to store unit during winter, or when not in use.
1. PREPARE THE WINDOW
Lower sash must open sufficiently to allow a clear vertical opening (see dimension
H in Table 1). Side louvers and the rear of the AC must have clear air space to allow
enough airflow through the condenser for heat removal. The rear of the unit must be
outdoors, not inside a building or garage.
Mounting Hardware
Lock Frame
(For Wooden windows)
(For Vinyl-Clad windows)
(2)
3/4'' (or 1/2")
Screws
(7)
Top Rail Hardware
3/8" Screws
Top Rail
(4)
(1)
2. PREPARE AIR CONDITIONER
Before installing the unit, the top rail must be assembled on the unit for models with a
capacity of less than 10,000Btu/h.
Packaging
Page 16
Lock Frame
Sash Lock
(1)
(2)
Window sash
seal foam
(1)
R1 Insulation Hardware
(2)
Fig. E
Top Rail
CAUTION
When handling unit, be careful to
avoid cuts from sharp metal edges
and aluminum fins on front and rear
coils.
A: Remove the air conditioner from the
carton and place on a flat surface.
B: Remove top rail from the packaging
material as shown in Fig. E.