Erreka NAOS NASR70E Manual Del Instalador página 56

Accionador de techo
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

INSTALLATION
Connection with LUMI flashing light
DIP1
Battery charger connection
ADN01
52
Installation guide
LUMI
(LAMP)
P278W
mo+
mo–
sp+
sp–
GND
P278V
Connection with the LUMI flashing light is shown as an
example.
1 Complete the connections as shown in the attached
figure.
Use the LUMI light cable connectors (A), for 12-
24VAC/ DC. Polarity is not important.
2 Configure DIP1 in "Flash" position.
Use the sp+ and sp- cable connectors (inside the
housing) if an emergency battery is to be used. Charger
CHG01 is required (included in kit ADN01 with 12V
1.2Ah batteries).
O
Respect the polarity.
1 Remove the NAOS operator housing to access the
electronic board's sp+ and sp- cable connectors.
2 Attach the charger and batteries in a suitable place.
3 Make the connections as shown in the diagram.
4 Reassemble the NAOS operator housing.

Hide quick links:

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Naos nasr100eNaos nasr70emNaos nasr100em

Tabla de contenido