Fig. 3
Rb
3.
Apply a light film of glue in the two dowel holes at each side on the bottom of the Top (H) and
slide the Top down over the dowels in the Sides (Qb and Rb). Using the pocket drilled holes as
guides, fasten in place with #8x1-3/16" Pan Head Screws (S). See Figures 3 and 3a.
Fig. 4
Attach the Wood Knobs (Eb) to the Drawer Front (N) with 4 x 25mm Machine Screws (U). Attach
4.
the Drawer Sides (Pb) to the Drawer Front with #8x1-3/16" Pan Head Screws (S). The grooves
for the drawer bottom in the Sides and Front must line up. See Figure 4. Repeat the step for
the second drawer.
Page 4 — 900Wc — 06/10
H
S
Pb
U
S
Fig. 3a
Qb
S
N
x 2
Eb
S
S
U
Eb
S
x 4
x 8
x 4
x 4