Maintenance at
-
every start-up
-
1
*
-
Disposal
Disposal must only be carried out in accordance with the section of the same na-
me in the "Safety rules" chapter.
Check wearing parts
-
Replace defective wearing parts
Purge the gas nozzle of welding spatter
Check gas nozzle, spatter guard, and insulations for damage and replace
damaged components.
In addition to the steps listed above, prior to starting up water-cooled wel-
ding torches always:
-
Ensure that all coolant connections are leak-tight
-
Ensure that there is a proper coolant return flow
2
25