Descargar Imprimir esta página

Key Automation SUN Serie Instrucciones Y Advertencias Para Su Instalación Y Uso página 10

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 17
EN
3 - PRELIMINARY CHECKS
Before installing this product, verify and check the following steps:
- Check that the gate or door are suitable for automation
- The weight and size of the gate or door must be within the
maximum permissible operating limits
- Check the presence and strength of the security mechanical stops
of the gate or door
- Check that the mounting area of the product is not subject to
flooding
- Conditions of high acidity or salinity or proximity to heat sources
could cause malfunction of the product
- Extreme weather conditions (for example the presence of snow,
ice, high temperature range, high temperatures) may increase the
friction and therefore the force required for the handling and initial
4 - INSTALLING THE PRODUCT
4.1 - Installation
ù
ATTENTION !
The installer shall check that the temperature range marked on
the drive is suitable for the location.
Before proceeding with the installation, check the integrity of the
product and that all components are present in the package.
Check that the gate weight respects the limit of the table (paragraph
2.2) and dimensions of the gear motor are met (Fig. 1).
Fig.2 shows a typical installation:
Gear motor (1)
4.2 - Installing the foundation box
Verify the orientation and the overall dimensions of the base plate, fix
to ground the base-plate through 4 sturdy screw-anchors or drown it
into the concrete (Fig.3).
Provide one or more corrugated duct tubes for routing the electric
cables.
4.3 - Motor unlock
To release the gearmotor remove the cap on the side (Fig.4.1) and
turn the pin with the release key or the Sub remote control (Fig.4.2).
Then turn the lever (Fig.5).
4.4 - Fixing the plate
Open the cover by applying leverage with a screwdriver on the re-
cesses at the sides (Fig.6).
Place the gearmotor on the plate and fix the 4 nuts (Fig.8a). If the
permitted adjustment of the rack is not sufficient, before tightening
the nuts the height of the gearmotor can be corrected using the four
regulator stud bolts (Fig.8b).
After the adjustment, it is important to fully tighten the nuts, making
10
starting point may be higher than under normal conditions.
- Check that the manual operation of gate or door is smooth and
friction-free and there is no risk of derailment of the same
- Check that the gate or door are in equilibrium and stationary if left
in any position
- Check that the power line to supply the product is equipped with
proper grounding safety and protected by a magnetothermal and
differential security device
- Provide the power system with a disconnecting device with a gap
of contacts enabling full disconnection under the conditions dic-
tated by the overvoltage category III.
- Ensure that all materials used for the installation comply with
current regulations
Photocells (2)
Columns for photocells (3)
Flashing light with antenna (4)
Key switch or digital keypad (5)
ATTENTION !
The automation system must be equipped with a pressure-
sensitive edge protecting all possible crushing points (hands,
feet, etc.) in accordance with the requirements of the EN 13241-
1 standard.
ATTENTION !
The exact dimensions of the rack must be known to allow pre-
cise calculation of the fixing plate position.
ATTENTION !
With motors with integrated night lights (Night Light System)
make sure not to rip off the cable that connects the leds on the
cover with the control board. If necessary, disconnect the con-
nector shown in figure 7.
sure that the gearmotor is firmly anchored to the ground throughout
the gate's travel stroke.
The screws should be tightened again after the gearmotor has been
operated a few times.
Replace the cover so that the light is pointed in the required direction
(Fig.9), such as towards the passage.

Publicidad

loading

Este manual también es adecuado para:

Sun5024Sun5324Sun5024fSun7024Sun7324Sun11024 ... Mostrar todo