Descargar Imprimir esta página

GM 3004 Manual De Usuario página 9

Estación de carga ultium powerup

Publicidad

Idiomas disponibles

Idiomas disponibles

3.2
HARDWIRE INSTALLATION
!
WARNING:
IMPORTANT - Hardwire installation can be performed by certified electricians ONLY.
!
CAUTION:
Use 6 AWG, 75°C copper wire for field wiring installation.
A hardwire installation requires removing the NEMA 14-50 plug, in order to permanently wire the Ultium PowerUP
Charge Station to the main incoming supply.
The hardwire installion of the Ultium PowerUP Charge Station can be reversed and the NEMA 14-50 plug refitted.
1. Remove the two screws located at the end of the
front cover (keep the screws for reassembly) →
Remove the front cover.
3. Loosen the highlighted cables from the terminals →
Unclip the temperature sensor cable from the white
snap in connector.
NOTE: Components may have been removed for image clarity.
Date
ALL INFORMATION WITHIN ABOVE
BORDER TO BE PRINTED EXACTLY
29NOV22
AS SHOWN ON 8.5 x 11 WHITE 16
13DEC22
POUND NON-BOND RECYCLABLE
PAPER. PRINT ON BOTH SIDES,
EXCLUDING TEMPLATES. TO BE
22MAR23
UNITED IN ACCORDANCE WITH
GMCCA SPECIFICATIONS.
Revision
Third Re l
Fourth Re l
Fifth Re l
2. Remove the two service lid screws (keep the screws
for reassembly) → Remove the service lid using
pliers and pull on the tabs as shown.
4. Remove the four screws and washers that secure
the cable clamp → Remove the cable clamp (keep
screws, washers and cable clamp for reassembly).
NOTE: Components may have been removed for image clarity.
84922762
PART No.
R 22MAR23
Auth
DR
Title
SAR
AH
SAR
MB
PART No.
SAR
MB
SHEET
Ultium PowerUP Charge Station
User Manual
SHEET
EN
 9

Publicidad

loading

Productos relacionados para GM 3004