Descargar Imprimir esta página

enphase HCS-40 Manual De Instalación Y Funcionamiento página 15

Ocultar thumbs Ver también para HCS-40:

Publicidad

Idiomas disponibles

Idiomas disponibles

HCS Installation and Operation Manual
The following diagrams illustrate the three service transformer secondary connections most
common in North America.
Figure 3: 220 V/240 V single phase
Figure 4: 208 V three-phase, wye-connected
NOTE: With a wye-connected secondary, any two of the legs can be used to provide 208 V to the HCS. For example,
L1 & L2, or L1 & L3, or L2 & L3. Leave the unused leg open. Do not connect it to a Neutral bar or to Ground. Be sure
the center point is grounded to Earth somewhere in the system.
January 2024
140-00277-03
120 V
NEUTRAL
(NOT USED)
120 V
L3 (NOT USED)
120 V
NEUTRAL
(NOT USED)
120 V
© 2024 Enphase Energy Inc. All rights reserved.
L1
240 V
L2
TERRE
GROUND
L1
208 V
L2
GROUND
15

Publicidad

loading