Descargar Imprimir esta página

Ribiland PRMCA10 Manual De Instrucciones Y Mantenimiento página 7

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

4. Thread the cable into-the rubber sheath of the cable gland, then through the drawing shutdown system.
5. Connect it up according to the diagram below:
- The green and yellow wire should be connected to the terminal Marked:
-The blue wire should be connected to the terminal marked N.
-The red wire should be connected to the terminal marked L.
Junction box
6. Ensure that all the wires are securely attached to the terminals.
7. Retighten the cord anchorage device, ensuring that the connector is resting on the power cable sheath and
not on the wires.
8. Replace the lid on the junction box by tightening up the crosshead screws.
9. Connect the power cable to the mains
4) CONNECTING THE SUCTION HOSE
When assembling, all connections should be sealed with Teflon to ensure that complete sealing is achieved.
For connections fitted with flat or O-ring type seals, it is not necessary to add Teflon.
Check periodically that the seals are sound. The suction hose should be a minimum of 25mm diameter and
be rigid to prevent it from being squashed. Do not forget to check the connections for the screen (sealed with
Teflon). Add clamps if necessary.
In any event, the suction hose should not be pointing upwards. When using in wells containing sand or
gravel, place the screen 50cm from the bottom or in a bucket at the bottom of the well.
5) CONNECTING THE DISCHARGE HOSE
In order to avoid leakage and to obtain optimum output, it is essential to seal the connections with Teflon.
6) START-UP
- Unscrew the filler cap from the body of the pump.
- Using a suitable container, fill the body of the pump until it overflows. (Do not splash water onto electrical
parts).
- Replace the cap and tighten so that no air can enter.
- If the water level drops in the body or it is not filling up properly, it is because there is an air intake. In this
event, check the suction hose connections, and then continue to refill the body.
- Ensure that there is no water on the electrical parts of the pump.
- Start up the pump and check again that there is no leakage from the body.
7) MAINTENANCE
- In winter, the pump should be thoroughly drained or kept in "frost free" conditions.
- Before each start-up, ensure that the seals are in good condition and that the connections are tight.
6

Publicidad

loading

Este manual también es adecuado para:

516266