Descargar Imprimir esta página

Giatsu AROMA 2E GIA-MSI-09AR2ER32 Manual Instalación página 65

Multisplit

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

SPLIT 1X1
AROMA 2E
NOTE ON ADDING COOLANT
ATTENTION
• Refrigerant charging should be done after wiring, vacuum and leak testing.
• DO NOT exceed the maximum allowable amount of refrigerant or overcharge the system.
Doing so may damage the unit or affect its operation.
• If you charge with inappropriate substances, it may cause explosions or accidents.
Make sure the proper coolant is used.
• Refrigerant containers should be opened slowly. Always wear protective equipment when
charging the system.
• DO NOT mix coolant types.
• For R-32 refrigerant model, ensure the conditions within the area are safe by controlling the
flammable material when adding refrigerant to the air conditioning equipment.
N=2 (modelos uno-dos), N=3 (modelos uno-tres)
N=4 (modelos uno-cuatro), N=5 (modelos uno-cinco)
Dependiendo de la longitud de la tubería de conexión o de la presión del sistema de extrac-
ción, será necesario añadir refrigerante. Consulte la tabla siguiente para conocer las cantida-
des de refrigerante que deben añadirse:
ADDITIONAL REFRIGERANT PER TUBE LENGTH
Precharge pipe length (ft/m)
(precharge pipe length x N)
Over (precharge pipe length x
Note: Standard pipe length is 7.5 m (24.6")
Pipe length
Method
connection (m)
air purge
Vacuum
pump
vacuum
N) ft/m
pump
Additional coolant
N/D
Liquid section: Ø 6.35
(Ø 1/4") R-32:
(Total pipe length - preload length
(Total pipe length - preload length
x N) x 12 g/m (Total pipe length -
x N) x 24g/m (Total pipe length -
preload length x N) 0.13 oZ/ft
INSTALLATION MANUAL
8. AIR PURGUE
Liquid section: Ø 9.52 (Ø 3/8")
R-32:
preload length x N) 0.26 oZ/ft
63

Publicidad

loading