8. ELECTRONIC UNIT
8.1. Interface
1
2
ELEMENT
Red LED
Green LED
Screen
8.2. Switching on
When first powering on the electronic unit:
After about a minute, production starts automatically, according to the setpoint displayed on the screen.
If the electronic unit is powered off (screen off, red LED on):
Press the upper control key twice. After about a minute, production starts automatically, according to the setpoint
displayed on the screen.
8.3. Switching off
Set the production setpoint to 00 using the top key (no confirmation required): after a few seconds, the screen turns
off and the red LED comes on.
The internal fan in the electronic unit may continue running as long as the device is powered on.
8.4. Salt value adjustment (ULTRA LOW SALT)
The nominal salt level should be adjusted to approximately 1 g/litre. It must not fall below 0.5 g/litre.
The adjustment is performed manually, and the measurement is taken using independent means (strip or measuring
device). Do not take into account the chlorine values given in the maintenance manual.
8.5. Setting the inversion frequency for the current powering the cell
I
The aim of the current inversion is to prevent limescale being deposited on the cell. The inversion frequency
must be correctly set following the table below in order to ensure that the cell continues to operate correctly over
the long term.
Possible settings: 02, 04, 06, 08, 10, 12, 14, 16 (hours).
Default setting: 04.
Non-contractual image
3
STATUS
Continuously on
Flashing
Continuously on
Default display
Flashing display
Steady display
1 : Red LED
2 : Green LED
4
3 : Screen
4 : Control keys
Electronic unit powered off
Production in progress
Production setpoint
Information awaiting validation, or alarm
Confirmed information
MEANING
Alarm activated
12