The reactor must always be on the discharge side after the filter.
-
It is necessary to provide a clearance above the reactor of at least 850 mm for an POOLSQUAD UV 25 or 600 mm for
-
an POOLSQUAD UV 15 to allow the bulb and quartz to be removed, and at least 250 mm behind the reactor to allow
the electrode to be removed.
The direction of flow must be respected.
-
The maximum pressure of the network must never exceed that of the reactor.
-
If there is a risk of overpressure, it is recommended that an automatic bleed or relief valve be installed to keep
the line pressure below that of the reactor.
If a bypass is used for heating, the UV unit must be installed after the bypass.
-
Using the pipe saddle clamp(s) (50, 63 or 75), attach the liquid pH injector and the pH probe in the correct order.
-
The reactor is designed to be placed on the ground.
-
6. UV LAMP
6.1. Fitting the lamp cable to the reactor
1.
2.
3.
4.
Unscrew the 4 screws on the cover with a Phillips screwdriver and remove the cover.
Insert the lamp cable connector through the free hole in the top of the reactor
Put the cable gland in place
Pass the connector through the nut and slide the nut until the nut comes into contact
with the cable gland
Screw the nut onto the cable gland and tighten normally
Connect the connector to the lamp (Do not force it: there is a direction of connection).
Replace the cover and refit the screws.