Electrical Installation
•
Lift off domed cover (A) after removing
the 4 screws (B).
•
Take power supply board (C) out of
the domed cover (A) after removing
the screw (D).
•
Guide cables for power supply (E) and
potential-free contact (F) through screwed
cable fittings.
•
Terminals - Check type plate (G) for
permissible mains voltage and ensure
conformity.
In the case of 24 Vdc operation, do not connect
+24 Vdc to frame because the internal housing
potential of the device is negative.
•
Connect potential-free contact (F) to
terminals 0.6 - 0.7 (fail safe) or 0.7 - 0.8
(open during malfunction).
•
Pull cable (E + F) tight and screw down
cable fittings.
•
Screw power supply board (G) with screw
(D) into domed cover (A).
•
Plug ribbon cable (H) into control PCB (K).
•
If the individual wires have not been
screwed into the plug,
they should be attached
as follows:
1.0 = brown
1.1 = blue
2.0 = black
•
Put on top of cover (A)
and tighten the 4 screws
(B).
The power supply board (C) is
in a reverse position (upside
down) in the domed cover (A).
During no-load operation, a
voltage of up to 36 Vdc may
be measured at terminals 1.0
and 1.1 (plug ribbon cable (H)).
Please ensure that the
installation is carried out
according to the valid
regulations.
14
All manuals and user guides at all-guides.com
K
H
K
H
Quincy Compressor-Q MAT 05 Condensate Drain
B
A
C
H
K
G
F
0.8
0.7
0.6
0.2
0.1
C
E
0.0
F
0.8
0.7
0.6
G
C
E
E
F
D
V
-
AC
VOLTAGES
NORMALLY OPEN
COMMON
NORMALLY CLOSED
PE E
/G
ARTH
ROUND
N
N
EUTRAL
L
P
HASE
24 V
-
DC
VOLTAGES
NORMALLY OPEN
COMMON
NORMALLY CLOSED
+24V +24 V
(0V)
DC
+24V 0V (+24 V
)
DC