Descargar Imprimir esta página

Westward 46V232 Manual De Instrucciones página 8

Publicidad

Idiomas disponibles

Idiomas disponibles

Westward Operating Instructions and Parts Manual
17. Stand the cart on end, front end facing up.
18. Assemble the two front axle supports to the cart using twelve M8X16 round head bolts (F) , Flat Washer Ø8 (U),
Lock Washer Ø8 (K) and M8 hex nuts (H) as shown in Figure 6. Do not tighten yet.
19. Place the front axle channels between the front axle supports. Assemble by two M8X65 hex bolts (B) through the
holes in the ends of the supports and secure with Ø8 lock washer (K), Ø8 Flat Washer (U) and M8 hex nuts (H).
Don't tighten. See Figure 7.
2000LB STEEL DUMP CART
Front Axle
Channel
FIGURE 6
FIGURE 7
8
46V232

Publicidad

loading

Productos relacionados para Westward 46V232