Descargar Imprimir esta página

Glacier bay F1AA4535BNV Guía De Uso Y Cuidado página 5

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation
1
Turning off water supplies
Shut off main water supply before installation.
3
Connecting the pipes
Apply sealant tape (G) on all threads. Connect
water supply tubes to the valve body (J). For
welding connection, remove inflammable
parts prior to soldering.
Attach the vertical shower pipe and elbow to
the valve body (J).
Attach the vertical spout pipe and elbow to the
valve body (J).
For shower only installation, install the plug (K)
included onto the bottom unused port.
2
Preparing for installation
Note the installation distance between the shower
arm (B), handle (E), and spout (F).
Fiberglass wall: Position the valve body (J) so
that the face of the plaster guard (H) will be flush
against the back of the fiberglass wall.
Drywall or drywall with tile: Position the valve
body (J) so that the face of the plaster guard (H)
will be flush with the face of the finished wall.
B
E
F
5
Please contact 1-855-434-5224 for further assistance.
Plaster guard
49 3/16 in.
1 13/16~2 5/16 in.
(1250 mm)
Plaster guard
6 in.
(152 mm)
Finish wall
J
K
HOMEDEPOT.com
1 15/16 in.
(50 mm)
Dry wall
G

Publicidad

loading

Este manual también es adecuado para:

814-278640-149