EdilKamin Simpaty CHERIE Instalación Uso Y Mantenimiento página 44

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 95
COVERING INSTALLATION VINTAGE
Phase A
Phase B
1
Phase C
Phase D
3
4
5
Phase A
This phase presents the stove after being unpacked and
positioned in the room
Phase B
Remove, pulling outwards, the upper front grille (1) and
the lower front panel (2), assembled in an interlocking
manner on the stove.
Phase C
ceramic front panel assembly:
Match up the holes with the threaded bushing of the cera-
mic front plates, with the corresponding holes on the grille
and front panel.
Secure the ceramic front panels by screwing the supplied
screws into the threaded bushings; tighten the screws by
1
hand only to prevent the ceramic from breaking.
Phase D
Remove the rear metal profiles (3-4-5) by unscrewing
the relative screws.
2
2
3
4
5
44

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Simpaty funnySimpaty moonSimpaty spaceSimpaty vintage

Tabla de contenido