EdilKamin Simpaty CHERIE Instalación Uso Y Mantenimiento página 45

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 95
COVERING INSTALLATION VINTAGE
Phase E
6
7
9
6
7
V V V
Phase F/G
3
5
8
6
7
4
10
3
5
45
Phase E
Installation of the ceramic intermediate side compo-
nents
Place the ceramic component parallely along the side,
fitting the housings 8 (at the ends of the front edge) into
the fastening brackets (6).
Slide the ceramic component towards the rear of the
stove until it fits completely on the brackets.
Reassemble the rear intermediate sheet metal profiles
(4).
Adjust the position of the ceramic element using
the adjustment grub screws (V); the three adjustment
grub screws must be tightened on each individual lower
fixing bracket (7).
Note: The grub screw must be inserted into the lower
fixing bracket with the hollow part facing down.
Phase F
Assembly of lower and upper ceramic side compo-
nents
Place the ceramic component parallely along the side,
fitting the housings 8 (at the ends of the front edge) into
the fastening brackets (6).
Slide the ceramic components towards the rear of the
stove until they fit completely on the brackets.
Reassemble the front sheet metal profiles (3-5).
Adjust the couplings and alignments of the upper cera-
mic element using the adjustment grub screws (V); the
three adjustment grub screws must be must be tightened
on each individual upper fixing bracket (7).
Note: The grub screw must be inserted into the upper
fixing bracket with the hollow part facing up.
Phase G
ceramic top assembly:
Place the ceramic top (10) over the cast iron stove top

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Simpaty funnySimpaty moonSimpaty spaceSimpaty vintage

Tabla de contenido