INSTALLATION
3 /
Starting the pump
When unpacking, remove the plastic film around the filter and rinse thoroughly.
Before starting the circulation pump, check that the water can flow easily into POOLICAN. And this
especially if POOLICAN is installed above the water level (often the case for installations on buried
pools).
To ensure that the pump is primed, it is essential to fill the filter basket until the water level stabilises
above the filter's reflux hole. You'll need about 5 litres of water, but depending on your installation,
the water will flow into the pipes, so don't hesitate to repeat the operation as often as necessary.
Once this level has been reached and stabilised, position the filter (unpacked) and close the lid securely.
When starting the pump be sure to leave the air bleed screw a little open to let the air escape, once
the water replaces the air close this bleed screw.
Remember to grease the joints to prevent them from drying out and leaking.
Fill with water
Filter backflow hole
Lid
Bleed screw
4 /
Electrical connections
POOLICAN's power plug integrates a 10mA RCBO.
Before plugging in your heat pump, ensure that the electrical socket is properly grounded.
Installation and maintenance of any upstream electrical components must be performed by a
qualified electrician. Failing to do so may result in electric shock, serious injury, property damage,
and even death.
Light on: indicates there is power.
Pressing "test" simulates a power cut.
Pressing "RESET" allows the power to be
switched back on.
The "test" and "RESET" functions should
be tested every month.
The power plug must not be exposed to
heavy rain (IPX4 standard).
14 |
EN