installation guide
Always use two people when setting up the base.
If installing a Divided King base, please refer to the Divided King Quick Setup Guide.
STEP 1
Place the bed base box in a desired location with the top of the
box facing up.
Remove the binding straps and packing materials, making sure not
to puncture the box with any sharp objects.
STEP 2
Remove the bed base from the box keeping the bottom of the
base facing upwards.
STEP 3
To install Headboard Brackets, see instructions on page 17.
To install the legs, thread the washer over the screw on the leg.
Next, screw the leg into the nutsert on the frame. Do not over
tighten.
The legs untwist into separate sections for custom leg height
options.
For customer support, visit www.ergomotion.com or call: 1-888-550-3746
8
STEP 4
To sync two bases see detailed installation
instructions on page 14.
Locate the power down box and set it aside. Be sure that it is
accessible after the base is set up.
STEP 5
Uncoil input Power Cord (connected to
Control Box's power port) and plug into
Power Supply.
STEP 6
Uncoil the Power Cord and connect to the
Power Supply. Place Power Supply on the
ground and extend from the base. Ensure
that the Power Supply and all attached
cords are directed toward the desired surge
protector.