Descargar Imprimir esta página
Ocultar thumbs Ver también para SDL 3300:

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

I
NSTALLATION

TOWER VERSION

This chapter describes the work needed to prepare the UPS for use in tower version.
WARNING: for your own safety and that of your product, it is important that you follow the instructions
given below exactly.
BEFORE PROCEEDING TO PERFORM THE SEQUENCE OF
OPERATIONS DESCRIBED, MAKE SURE THAT THE UPS IS SWITCHED
OFF COMPLETELY AND IS NOT CONNECTED TO THE ELECTRICAL
MAINS OR LOAD OF ANY KIND
Once removed from its packaging, the UPS is already prepared for installation in tower configuration.
To complete the configuration, all that is needed is to fit the two plastic covers provided on the top part of
the UPS, as described below:
the 2 covers have a snap-fit fastening system:
identify the special holes for mounting of the covers in the top part
of the UPS and, taking the utmost care, fit the covers exerting a
slight pressure (see figure to the side).
Note: as the covers are perfectly identical, they can both be fitted
in either of the areas (front/back) on the top of the UPS without
any problem.
48

Hide quick links:

Publicidad

loading

Este manual también es adecuado para:

Sdl 4000Csdl3k3aa4